Your PHP application is out of support. Your roadmap can't stop.

We run phased Strangler Fig migrations on business-critical Laravel, CakePHP and Symfony applications — and on the Vue 2 frontends in front of them. Every phase ships behind an automated parity suite, and no change reaches a pull request without a named senior engineer signing off.

No rewrite. No feature freeze. No data migration.

Book a technical assessment

The problem

The framework is years past end of support, and security questionnaires are starting to fail.

One or two developers hold all the context, and neither can be spared for six months.

A previous attempt stalled halfway, or never started because nobody could estimate it.

Nobody can prove a change didn't break existing behaviour — so nothing gets changed.

How we work

Strangler Fig, in phases

Each phase ships on its own. No freeze, no big bang.

Automated parity suite

Every phase proves the new path behaves like the old one before it completes.

Named human gate

No AI-assisted change reaches a pull request without a named senior engineer signing off. QA validates every cutover.

Documentation you keep

Architecture decision records, an operational runbook, and a parity report per phase.

Selected work

UK CONSUMER-CREDIT LENDER

CakePHP 4 to Laravel 12, in production since 2018: 256 controllers, 150,000 lines. Strangler Fig over a single shared database — no data migration.

55,000
lines removed
85%
code-complete at 7mo

Rewritten alongside the live service, with no data migration and no interruption to it.

FRENCH HEALTHCARE SAAS

Frontend architecture allowing Vue 2 and Vue 3 to coexist, so components migrated gradually with no pause in feature delivery.

2 → 3
Vue versions, coexisting

Later adopted as the company-wide standard.

US EDTECH PLATFORM

Spanish market opened on a legacy Symfony application, with A/B testing running in production on an unsupported Vue 2 frontend.

90+
Lighthouse score

No rebuild.

WHERE IT STARTS

Modernization Audit

From US$ 4,000 · Ten business days

A complete technical assessment of the codebase, database, integrations and deployment pipeline, delivered as a written report and presented to your team:

  • Risk register, ranked by business impact — not by technical severity
  • Current-state architecture map
  • Phased migration plan with parity criteria per phase
  • Cost and timeline estimates per phase, with assumptions stated

50% of the audit fee is credited against the first phase if you proceed within 30 days. If you decide to run the migration internally, the plan is still yours.

Book a technical assessment

Klim Works is led by Rodrigo Klim, tech lead on the migration described above. Every engagement has a named senior engineer accountable for it.